Zum Hauptinhalt springen

Galaxy Aqua Premier Installation Manual Better ((install)) [TRENDING 2026]

Choosing the right location is critical.

Drive the mounting screws into the plugs, leaving roughly 1/4 inch of the screw head exposed.

Forget black-and-white line drawings.

The shower allows for top, bottom, or side cable/pipe entry. Use the provided entry seals to ensure the unit remains watertight. Electrical Connections:

Position the unit so the highest user can easily reach the controls, but the showerhead riser rail has enough clearance from the ceiling. galaxy aqua premier installation manual better

Open the 3-way diverter valve to allow water into the system. Check the pre-filter housing for any immediate leaks.

Purge the system by letting water run through the unit (cold) for 2 minutes. Choosing the right location is critical

Inspect all pipework and the pressure relief device (PRD) before replacing the cover. Cover Attachment:

Connect this to the tank if your system requires one. Step 6: Install the Drain Saddle The shower allows for top, bottom, or side cable/pipe entry

Drill your holes for the rail. If drilling into tile, use a piece of masking tape over the spot to prevent the drill bit from skating and scratching the surface. 6. Commissioning the Shower (The Crucial Step)

Download the PDF before you cut any tubing. Your floor will thank you. đź’§đź”§

Click to access the login or register cheese